The list of active projects for the implementation of the sewage collection and transfer network in Golestan province

Gorgan:

1. Implementation of piping operations of a part of Shahrgorgan sewage network - open trench

2. Implementation of piping operations of a part of Shahrgorgan sewage network - closed trench 1

Gonbad:

1. Implementation of the construction of the sewage treatment plant in Gonbad city - Civil

2. Continue construction of the main pumping station in Gonbad city

3. Implementation of additional operations for sewage pumping station number 9 (with 86% physical progress)

4. Implementation of part of the sewage system (with 7% physical progress)

5. Implementation of operations in the wastewater treatment plant (at the stage of concluding the contract)

6. Purchase and installation of electromechanical equipment for 4 sewage stations (at the stage of document preparation)

7. Implementation of additional operations of Gonbad sewage treatment plant (at the stage of document preparation)

 Azadshahr:

1. Construction of Azadshahr wastewater treatment plant (with 45% physical progress)